岩棉外墙外保温系统施工要点
添加时间:2019/4/18 15:08:08     浏览次数:
岩棉外墙外保温系统施工要点
Key Construction Points of Rockwool Exterior Wall Exterior Insulation System
1.施工前,应根据设计和本规程要求以及相关的技术标准编制针对工程项目的节能保温专项施工方案,并应对施工人员进行技术交底和专业技术培训。
1. Before construction, special construction schemes for energy saving and heat preservation of engineering projects should be worked out according to the requirements of design and these regulations and relevant technical standards, and technical submission and professional technical training should be conducted for construction personnel.
2.岩棉板外保温系统用于节能保温工程的施工应按照经审查合格的施工图设计文件和经审批通过的用于工程项目的节能保温专项施工方案进行。
2. The construction of rock wool board external thermal insulation system for energy-saving and thermal insulation projects shall be carried out in accordance with the qualified construction drawing design documents and the special construction scheme for energy-saving and thermal insulation projects approved by the examination and approval.
3.岩棉板外保温系统的生产企业应有专业人员在施工过程中进行现场指导,并配合施工单位和现场监理做好施工质量控制工作。
3. Production enterprises of rock wool board external thermal insulation system should have professional personnel to conduct on-site guidance in the construction process, and cooperate with construction units and on-site supervision to do a good job of construction quality control.
4.材料进场必须按规格,数量和质量要求经过验收合格才能入库,并应有专人保管,严禁露天堆放。幕墙岩棉板应架空防潮堆放。
4. Material must be checked and accepted in accordance with specifications, quantity and quality requirements before storage, and should be kept by a special person. Open storage is strictly prohibited. Rock wool board of curtain wall should be stacked overhead and moistureproof.
5.施工应具备以下条件:
5. Construction shall meet the following requirements:
(1)基层墙体及其水泥砂浆找平层处理及预埋件安装完毕。
(1) The treatment of base wall and cement mortar leveling layer and the installation of embedded parts have been completed.
(2)必要的施工机具和劳防用品应已准备齐全。
(2) Necessary construction equipment and labor protection equipment should be ready.
(3)施工专用脚手架应搭设牢固,安全检验合格。脚手架立杆与水平杆与墙面,墙角的间距应满足施工要求。
(3) Special scaffolding for construction shall be firmly erected and qualified for safety inspection. The spacing between scaffolding pole and horizontal pole and wall surface should meet the construction requirements.
(4)基层墙体应坚实平整,表面干燥,不得有开裂,空鼓,松动或泛碱,水泥砂浆找平层的粘结强度,平整度及垂直度应符合(建筑装饰装修工程质量验收规范)GB50210中普通抹灰工程质量的要求。
(4) The base wall should be firm and flat, the surface is dry, no cracking, empty drum, loose or pan-alkali, the bond strength of cement mortar leveling layer, the smoothness and verticality should meet the quality requirements of plastering engineering in GB50210 (Quality Acceptance Specification for Building Decoration and Decoration Engineering).
上一页  岩棉条特点  
下一页  岩棉条其它延伸性用途
  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3

网站建设及优化 :保定遨游公司

  • 一键拨号
  • 网上订单
  • 联系我们
  • 本站导航

首页

  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3